© 2019 Horizon Engineering Group, Inc., All Rights Reserved

SR 45 RRR and Intersection Improvements at CR 491

Owner: FDOT District 7     Location: Citrus County

This project included the milling and resurfacing of SR 45. The project included the milling and resurfacing, safety updates and minor drainage design for 11.0 miles of a 2-lane rural roadway. At the CR 491 intersection left turn lanes were provided on all four approaches along with a new mast arm signal. Design efforts included the preparation of safety report, multi modal facilities justification report, utility coordination, flexible pavement design package, design exception and variation report and community awareness plan.