© 2019 Horizon Engineering Group, Inc., All Rights Reserved

SR 200 Widening and Reconstruction

Owner: FDOT District 2     Location: Duval/Nassau County

Widening and reconstruction of this 17 mile Limited Access four lane facility. Work included roadway drainage design, signing and pavement markings, and utility relocations. The project also included the design of 6 bridge crossings (11 total bridge structures), 16 box culvert replacements, and 19 retention ponds.