© 2019 Horizon Engineering Group, Inc., All Rights Reserved

Horizon Engineering Group in association with Ranger Construction, has been selected for the Florida Turnpike Enterprise's widening and resurfacing of Polk Parkway (Design Build) project!

January 16, 2020

The Horizon / Ranger team was awarded the Widening and Resurfacing of Polk Parkway (Design Build) project for Florida Turnpike Enterprise!

 

This Design Build project consists of widening and resurfacing 4 miles of Polk Parkway (SR 570) from 2 lanes to 4 lanes. It also includes the construction of a fully directional interchange at  Braddock Rd. that includes roundabouts at the ramp terminals, a new mainline bridge over CR 546 widening & reconstruction of Braddock Rd. 2-lane to 4-lane divided, existing mainline toll plaza tolling structures will be demolished and new All Electronic Tolling (AET) will be constructed.

 

Congratulations to Ranger Construction and the entire Team. A big thanks to all that helped with the preparation of this major proposal and the marketing effort that contributed to this win!

 

Share on Facebook
Please reload

FEATURED POST

Horizon Engineering Group in association with Ranger Construction, has been selected for the Florida Turnpike Enterprise's widening and resurfacin...

January 16, 2020

1/3
Please reload

RECENT POST

October 8, 2019

October 7, 2019

Please reload

ARCHIVE

Please reload