Whats happening on Horizon's Engineering Section 6 of the I-4 Ultimate project which includes just east of Central Parkway to one mile east of SR 434 for a total of 2.3 miles. The design includes mainline I-4, the interchange at SR 434 and I-4, 5 stormwater ponds, a new bridge structure at SR 434, TTCP for both I-4 and SR 434, 16 temporary critical walls, and 9 permanent MSE walls.

FEATURED POST

RECENT POST

  • White Facebook Icon
  • White LinkedIn Icon
  • White YouTube Icon

© 2019 Horizon Engineering Group, Inc., All Rights Reserved